[LỜI GIẢI] Bài đọc và đáp án chi tiết từng câu tiếng anh - Tự Học 365
LUYỆN TẬP TRẮC NGHIỆM 50000+ CÂU HỎI

DÀNH CHO MỌI LỚP 6 ĐẾN 12

TRUY CẬP NGAY
XEM CHI TIẾT

Bài đọc và đáp án chi tiết từng câu tiếng anh

Bài đọc và đáp án chi tiết từng câu tiếng anh

Câu hỏi

Nhận biết

Questions 23-26 refer to the following article.

Airport Expansion Continues

26 May-A major airport expansion project is under way in Onalia City. The project is estimated to cost $1.6 billion, and a new terminal is scheduled to open for international service in approximately one year.

The airport, however, sits on a confined piece of land, which presents significant challenges to increasing the number of takeoffs and landings. If the airport remains limited to its current two runways, the capacity to handle air traffic could be reached within three years.

To address the problem, officials overseeing the Onalia City Airport project have contracted a group of engineers from Wilford Engineering to explore the possibility of extending a third runway over the Pacific Ocean, the engineering firm will survey the area for six months before presenting their findings and recommending a plan of action.

Runways that extend over water are not unprecedented. This type of runway exists in places such as Gibraltar and Japan, which have faced similar challenges.

0Câu 23

Why is Onalia City Airport undergoing an expansion?

A. To accommodate flights to other countries

B.To provide service to a growing population in surrounding cities

C. To compete with a nearby airport

D. To reduce flight delays

Câu 24

In paragraph 2, line 5, the word “handle” is closest in meaning to

A. touch

B.manage

C. examine

D. release

Câu 25

What has Wilford Engineering been hired to do?

A. To determine whether a potential runway site is suitable

B.To develop a plan for increasing the size of the air traffic control tower

C. To investigate how to improve traffic on roads leading to the airport

D. To review expansion plans with officials in Gibraltar and Japan

Câu 26

What is suggested about Onalia City Airport?

A. It has been open for one year.

B.It has earned $1.6 billion in revenue.

C. It has sustained structural damage

D. It is located on the coast.


Đáp án đúng:

Lời giải của Tự Học 365

Đáp án Câu 23 : A

Đáp án Câu 24 : B

Đáp án Câu 25 : A

Đáp án Câu 26 : D

Ý kiến của bạn